These programs have involved the rehabilitation of arterial and collector roadways across a wide range of urban and rural environments, with work that includes asphalt resurfacing, drainage improvements, culvert and guiderail replacement, and staging to manage resident access and traffic flow.
- Asphalt Removal
- Warm Mix Asphalt Paving
- Intersection Improvements
- Microsurfacing
- Road Resurfacing
- Road Rehabilitation
- Berm Removal
- Guiderail Work
- Partial Depth Removal
- Hot Mix Asphalt Paving
- Structural Culvert Replacement
- Retaining Wall Construction
- Pavement Rehabilitation
- Road Reconstruction
Project profile:
- The Regional Municipality of York has proposed a project for Site Coordination and Inspection Services for the 2023 Minor Capital Road Rehabilitation and Improvement Projects at various locations throughout the region.
- The project includes site coordination and inspection services for various minor capital road rehabilitation and improvement projects, including but not limited to:
- Asphalt Removal, Warm/Hot Mix Asphalt Paving, and Intersection Improvements at locations such as Kennedy Road, The Queensway South, Glenwoods Avenue, Ravenshoe Road, Jane Street, Dufferin Street, Yonge Street, Leslie Street, Bloomington Road, Major Mackenzie Drive, and Lloydtown-Aurora Road.
- Pavement Preservation – Microsurfacing at locations such as Highway 7, Dalton Road, Leslie Street, and McCowan Road.
- Contract administration and site inspection services are also included as part of the contract.












